Built on screen before it is built on site. Your architect, engineers and builder work on one 3D model, so problems are solved before construction, saving time and money.

Talk to us about BIM →Aligned with ISO 19650
WE design and build as oneΕΜΕΙΣ σχεδιάζουμε και χτίζουμε ως έναArchitectΑρχιτέκτοναςEngineerΜηχανικόςServicesΜελετητής Η/ΜOne shared modelΈνα κοινό μοντέλοSame information for everyoneΊδια πληροφορία για όλουςEvery change, seen by allΚάθε αλλαγή, τη βλέπουν όλοι

What BIM gives you

Six benefits of designing in BIM
01 / 06

Problems found early

Take one example: on site, a window drawn where a column stands stops work and costs weeks. In our model we see the same clash before construction and fix the design in minutes. The same goes for any conflict between walls, structure, openings, stairs or services.

Fewer surprises, delays and extra costs. (Example figures.)
0101Problems found earlyΠροβλήματα εντοπίζονται νωρίςOn siteΣτο εργοτάξιοIn our modelΣτο μοντέλο μας!+3 weeks · +€8k+3 εβδ. · +€8kdelay and reworkκαθυστέρηση, ζημιά10 min · €010 λεπτά · €0fixed before siteλύθηκε νωρίςexample figuresενδεικτικά νούμεραExample: one clash, two places to find itΠαράδειγμα: μία σύγκρουση, δύο σημεία εντοπισμούOn site: work stops, costs riseΣτο εργοτάξιο: καθυστέρηση και κόστοςIn our model: fixed in minutesΣτο μοντέλο μας: λύνεται σε λεπτά
02 / 06

Cost under control

The model counts every part of the design, from wall blocks to windows and floor tiles. You get a reliable cost early, while the design can still be adjusted to your budget.

You know the cost before building, not after. (Example figures.)
0202Cost under controlΚόστος υπό έλεγχοWall blocksΤούβλα0WindowsΠαράθυρα0Floor tilesΠλακάκια0 m²BudgetΠροϋπολογ.€186kexampleπαράδειγμαThe model counts every materialΤο μοντέλο μετρά κάθε υλικόSo we know the cost before buildingΞέρουμε το κόστος πριν χτίσουμεAnd we keep it on budgetΚαι το κρατάμε εντός προϋπολογισμού
03 / 06

Accurate build time (4D)

Add time to the 3D model and you get 4D: every stage, from foundations to windows and finishes, planned week by week.

A handover date you can rely on. (Example weeks.)
0303Accurate build time (4D)Ακριβής χρόνος κατασκευής (4D)WeekΕβδομάδα2FoundationsΘεμελίωσηFrameΣκελετόςWallsΤοιχοποιίαFinishesΤελειώματαW0Ε0W6Ε6W12Ε12W18Ε18W24Ε24HandoverΠαράδοση3D model + time = 4D3D μοντέλο + χρόνος = 4DEvery stage planned week by weekΚάθε στάδιο, εβδομάδα προς εβδομάδαA reliable completion date from day oneΑξιόπιστη ημερομηνία παράδοσης
04 / 06

Less waste

The model counts every block, so materials are ordered in the exact quantity, with no 15% extra "just in case".

Lower cost and a cleaner site. (Example figures.)
0404Less wasteΛιγότερη σπατάλη+15% extra+15% επιπλέον601 blocksSite wasteΑπορρίμματαThe model counts every blockΤο μοντέλο μετρά κάθε τούβλοSo we order exactly what is neededΠαραγγέλνουμε ακριβώς ό,τι χρειάζεταιLess waste, lower costΛιγότερη σπατάλη, χαμηλότερο κόστος
05 / 06

Useful for years

At handover you receive the model, not only drawings. Every part keeps its information, such as when it was installed and when it needs a service.

Easier maintenance for the life of the building. (Example dates.)
Processes aligned with ISO 19650
0505Useful for yearsΧρήσιμο για χρόνια202720272035203520452045Window W-03Παράθυρο Π-03Installed 2027Εγκατάσταση 2027Seals check 2030Έλεγχος 2030exampleπαράδειγμαReminder setΥπενθύμισηAfter handover, the model keeps workingΤο μοντέλο βοηθά και μετά την παράδοσηEvery part carries its informationΚάθε στοιχείο έχει τις πληροφορίες τουEasier maintenance for yearsΕυκολότερη συντήρηση για χρόνια
06 / 06

Digital twin

We solve the whole building in our software first, before anything is built.

On site, we update the model with real-world data as construction goes on, so the model always matches the building that is really there.

At handover you get a model that matches what was built. (Example figures.)
0606Digital twinΨηφιακό δίδυμοOur modelΤο μοντέλο μαςOn siteΣτο εργοτάξιοUpdated: as builtΕνημερώθηκε: όπως κτίστηκεwall +2 cm (example)τοίχος +2 εκ. (παράδ.)Solved in our model firstΛυμένο πρώτα στο μοντέλο μαςThen built on site, stage by stageΜετά χτίζεται στο εργοτάξιο, στάδιο-στάδιοReal site data keeps the model trueΤα πραγματικά δεδομένα ενημερώνουν το μοντέλο
Hover or tap a card to open it

The difference BIM makes

TopicWithout BIMWith BIM
ProblemsFound on site, where they stop work and cost moneyFound on screen and fixed before construction
CostBecomes clear as the bills arriveKnown early, from the quantities in the model
Build timeAn estimatePlanned week by week
MaterialsOrdered with extra, "just in case"Ordered in the exact quantity
After handoverA set of drawingsA model with the information of every part

BIM services

See what each client receives →

Questions clients ask

Does BIM cost more?

The design stage takes a little more work up front, because the building is modelled in detail. That effort is usually repaid on site, through fewer changes, less waste and fewer delays.

Is BIM worth it for a house?

Yes. Even for a single home, seeing the design in 3D helps you decide with confidence, and coordinated drawings mean fewer surprises for your builder.

What do I receive at the end?

A full set of coordinated drawings, material quantities and, on request, the 3D model itself, with information on every part of the building for future maintenance.

Can you work with my engineers and contractor?

Yes. We share the model in open formats such as IFC, so engineers and contractors can use it whatever software they work with.

Projects designed in BIM

All projects →

Modelled in BIM from the first sketch. Open one to see the project. Which projects: to confirm

CommUnity Residence
CommUnity ResidenceResidential
Bellissimo Beauty Clinic & St Raphael Annex
Bellissimo Beauty Clinic & St Raphael AnnexCommercial
Office Building
Office BuildingCommercial